Start with a room schedule, not a shopping list
Write down what each room needs: switched or dimmed lighting, curtains, AC zones, network points and any security interfaces. Mark where you will enter, sit, work and sleep. A bedside scene switch solves a different problem from a central touchscreen. This schedule becomes the reference for a quotation and helps prevent equipment being selected before its purpose is clear.
Separate the three networks in the design
Power circuits supply lighting, motors and other loads. The control system carries commands between compatible devices. The data network connects equipment such as access points, intercoms and cameras. These systems interact, but their cable types and installation requirements are different. Your qualified designer should specify routing, segregation, protection and cable ratings for the actual equipment and applicable requirements. Do not treat a network cable as a universal substitute.
What changes with KNX or wireless?
A wired KNX design requires coordination of bus devices, power supply, actuators and the distribution board. A wireless design may reduce control cabling, but still needs suitable power, compatible loads and a reliable communications plan. Neither option removes the need to assess neutral conductors, switch-box space, dimming compatibility or curtain-motor requirements. Keep the comparison practical: what is already installed, what can be changed and what needs local control?
Check these details before finishing
Confirm curtain-motor power points and access for maintenance. Coordinate AC interfaces with the exact indoor and outdoor unit models. Plan ceiling access points and data backhaul before choosing decorative finishes. Reserve accessible distribution-board space based on a documented design rather than an arbitrary spare percentage. Label lighting circuits and network points so drawings, cables and software use consistent names.
Understand what drives the wiring cost
A useful smart home installation quote separates design, cabling, boards, devices, programming, commissioning and making good. Room count alone is a poor comparison: circuit count, dimming, cable routes, number of AC zones and the stage of finishing all matter. For an existing apartment, ask which functions can be upgraded using current wiring and which would require electrical work. Avoid assuming that every wireless installation is completely free of changes.
Agree the handover documents now
Request the circuit schedule, relevant drawings, equipment list, test records and a clear process for configuration backups. Include scene testing and household training in the agreed scope. If the project uses KNX, agree how the current ETS project and security information will be handed over or securely retained. Planning these deliverables before installation makes acceptance much clearer.
Your practical checklist
- An agreed room and scene schedule
- Electrical and automation drawings coordinated with the contractor
- Confirmed AC, dimming and motor compatibility
- Accessible equipment and labelled circuits
- A quotation that includes testing, documentation and support
Frequently asked questions
Can I plan home automation after finishing?
Yes, but the options depend on the wiring, available space and selected devices. A survey can identify what can be reused and what needs changing.
Does every smart home need KNX wiring?
No. Wired KNX, wireless and hybrid systems serve different project conditions. Select the architecture after assessing the property and requirements.
Can I get a fixed price by room count?
A room count is a starting point. A reliable quotation also needs the circuits, controls, interfaces, cabling and installation scope.
Plan around your home
Send Sedra Electric your floor plan and finishing stage to discuss a coordinated smart-home design.