Compare scope before comparing totals
Two quotations can both say “smart villa” while covering very different work. One may include only switching; another may include dimming, curtains, HVAC gateways, networking and commissioning. Start with a shared schedule of rooms and functions, then ask each bidder to complete it. A lower total is meaningful only after the differences are visible.
Create a room-by-room points schedule
List each lighting circuit and identify switching or dimming. Count curtain motors separately from wall controls. Record each AC zone and actual unit model, not only the brand. Add touchscreens, keypads, sensors, intercom doors and cameras as separate entries. Leave unknown quantities marked “to be surveyed” rather than quietly treating them as zero.
Ask for model numbers and dependencies
For each line, record manufacturer, model, quantity, unit price and required accessories. Ask which gateway, controller, power supply, network equipment or cloud service enables the promised function. A phone app does not establish interoperability by itself. Separate local operation from remote access, and request a demonstration of the agreed offline functions.
Separate installation, programming and handover
Confirm who supplies cables, back boxes, racks, protection, switches and any civil work. Identify commissioning tests, training, documentation, project-file delivery where applicable, and administrator access. Record warranty coverage, exclusions, response arrangements and any recurring fees. Unknown terms should become written questions before you approve the scope.
Use the worksheet without treating it as a design
The downloadable CSV is a comparison template, not a bill of quantities, a price offer or electrical instructions. Open it in Excel or Sheets and add your project-specific lines. Ask a qualified integrator to validate quantities and compatibility. Do not place passwords, personal identification or sensitive building-security details in a worksheet shared with several bidders.
How to evaluate the final decision
Compare fulfilled requirements, unresolved exclusions, support and future changes alongside total cost. A clear exception is better than an unsupported “everything included.” Request an updated revision when the scope changes, and keep the accepted schedule with your contract and handover documents. Sedra Electric can discuss your plans, finishing stage and required functions before preparing a project-specific proposal.